| cement carbon capture retrofit,lifetime,20.0,years,"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-21, accessed 2025-04-16",,2019.0,, | ||
| cement dry clinker,FOM,4.0,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,, | ||
| cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,, | ||
| cement dry clinker,carbondioxide-output,0.5089,t_CO2/t_clinker,https://www.ipcc-nggip.iges.or.jp/efdb/ef_detail.php,Original values 0.5089 per Mt clinker,2015.0,, |
There was a problem hiding this comment.
do you mean "Original values 0.5089 [Mt] per Mt clinker"? or is Mt a typo?
bobbyxng
left a comment
There was a problem hiding this comment.
LGTM, only a minor comment question on the original values' unit.
There was a problem hiding this comment.
Pull request overview
This PR adds an explicit clinker calcination (process) CO₂ emissions factor to the technology-data cost tables, making clinker/cement sector modelling able to account for unavoidable process emissions independent of heat supply.
Changes:
- Added
carbondioxide-output = 0.52 t_CO2/t_clinkerforcement dry clinkertoinputs/manual_input.csv. - Propagated the new
carbondioxide-outputrow into the generatedoutputs/costs_*.csvandoutputs/US/costs_*.csvsnapshots for all model years. - Added a corresponding entry to the upcoming release notes.
Reviewed changes
Copilot reviewed 16 out of 16 changed files in this pull request and generated 15 comments.
Show a summary per file
| File | Description |
|---|---|
| outputs/US/costs_2050.csv | Adds clinker process CO₂ output row to US 2050 cost snapshot |
| outputs/US/costs_2045.csv | Adds clinker process CO₂ output row to US 2045 cost snapshot |
| outputs/US/costs_2040.csv | Adds clinker process CO₂ output row to US 2040 cost snapshot |
| outputs/US/costs_2035.csv | Adds clinker process CO₂ output row to US 2035 cost snapshot |
| outputs/US/costs_2030.csv | Adds clinker process CO₂ output row to US 2030 cost snapshot |
| outputs/US/costs_2025.csv | Adds clinker process CO₂ output row to US 2025 cost snapshot |
| outputs/US/costs_2020.csv | Adds clinker process CO₂ output row to US 2020 cost snapshot |
| outputs/costs_2050.csv | Adds clinker process CO₂ output row to global 2050 cost snapshot |
| outputs/costs_2045.csv | Adds clinker process CO₂ output row to global 2045 cost snapshot |
| outputs/costs_2040.csv | Adds clinker process CO₂ output row to global 2040 cost snapshot |
| outputs/costs_2035.csv | Adds clinker process CO₂ output row to global 2035 cost snapshot |
| outputs/costs_2030.csv | Adds clinker process CO₂ output row to global 2030 cost snapshot |
| outputs/costs_2025.csv | Adds clinker process CO₂ output row to global 2025 cost snapshot |
| outputs/costs_2020.csv | Adds clinker process CO₂ output row to global 2020 cost snapshot |
| inputs/manual_input.csv | Adds the clinker process CO₂ output factor to the input assumptions table |
| docs/release_notes.rst | Notes the clinker process emissions addition in the upcoming release section |
💡 Add Copilot custom instructions for smarter, more guided reviews. Learn how to get started.
| cement dry clinker,gas-input,2006,0.00016,MWh_NG/t_clinker,2015,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original values 0.0058 PJ per Mt clinker | ||
| cement dry clinker,electricity-input,2006,0.0694,MWh_el/t_clinker,2015,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original values 0.25 PJ per Mt clinker | ||
| cement dry clinker,heat-input,2006,0.9444,MWh_th/t_CO2,2015,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original values 3.4 PJ per Mt clinker | ||
| cement dry clinker,carbondioxide-output,2006,0.52,t_CO2/t_clinker,2015,"https://www.ipcc-nggip.iges.or.jp/efdb/ef_detail.php", Basic Search Description 'Emission factor for clinker production' EF ID 213926 Original value 0.52 per Mt clinker |
| cement carbon capture retrofit,lifetime,20.0,years,"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-21, accessed 2025-04-16",,2019.0 | ||
| cement dry clinker,FOM,4.0,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0 | ||
| cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0 | ||
| cement dry clinker,carbondioxide-output,0.52,t_CO2/t_clinker,https://www.ipcc-nggip.iges.or.jp/efdb/ef_detail.php, Basic Search Description 'Emission factor for clinker production' EF ID 213926 Original value 0.52 per Mt clinker,2015.0 |
| cement carbon capture retrofit,lifetime,20.0,years,"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-21, accessed 2025-04-16",,2019.0 | ||
| cement dry clinker,FOM,4.0,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0 | ||
| cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0 | ||
| cement dry clinker,carbondioxide-output,0.52,t_CO2/t_clinker,https://www.ipcc-nggip.iges.or.jp/efdb/ef_detail.php, Basic Search Description 'Emission factor for clinker production' EF ID 213926 Original value 0.52 per Mt clinker,2015.0 |
| cement carbon capture retrofit,lifetime,20.0,years,"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-21, accessed 2025-04-16",,2019.0 | ||
| cement dry clinker,FOM,4.0,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0 | ||
| cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0 | ||
| cement dry clinker,carbondioxide-output,0.52,t_CO2/t_clinker,https://www.ipcc-nggip.iges.or.jp/efdb/ef_detail.php, Basic Search Description 'Emission factor for clinker production' EF ID 213926 Original value 0.52 per Mt clinker,2015.0 |
| cement carbon capture retrofit,lifetime,20.0,years,"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-21, accessed 2025-04-16",,2019.0 | ||
| cement dry clinker,FOM,4.0,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0 | ||
| cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0 | ||
| cement dry clinker,carbondioxide-output,0.52,t_CO2/t_clinker,https://www.ipcc-nggip.iges.or.jp/efdb/ef_detail.php, Basic Search Description 'Emission factor for clinker production' EF ID 213926 Original value 0.52 per Mt clinker,2015.0 |
| cement carbon capture retrofit,lifetime,20.0,years,"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-21, accessed 2025-04-16",,2019.0,, | ||
| cement dry clinker,FOM,4.0,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,, | ||
| cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,, | ||
| cement dry clinker,carbondioxide-output,0.52,t_CO2/t_clinker,https://www.ipcc-nggip.iges.or.jp/efdb/ef_detail.php, Basic Search Description 'Emission factor for clinker production' EF ID 213926 Original value 0.52 per Mt clinker,2015.0,, |
| cement carbon capture retrofit,lifetime,20.0,years,"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-21, accessed 2025-04-16",,2019.0,, | ||
| cement dry clinker,FOM,4.0,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,, | ||
| cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,, | ||
| cement dry clinker,carbondioxide-output,0.52,t_CO2/t_clinker,https://www.ipcc-nggip.iges.or.jp/efdb/ef_detail.php, Basic Search Description 'Emission factor for clinker production' EF ID 213926 Original value 0.52 per Mt clinker,2015.0,, |
| cement carbon capture retrofit,lifetime,20.0,years,"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-21, accessed 2025-04-16",,2019.0,, | ||
| cement dry clinker,FOM,4.0,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,, | ||
| cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,, | ||
| cement dry clinker,carbondioxide-output,0.52,t_CO2/t_clinker,https://www.ipcc-nggip.iges.or.jp/efdb/ef_detail.php, Basic Search Description 'Emission factor for clinker production' EF ID 213926 Original value 0.52 per Mt clinker,2015.0,, |
| cement carbon capture retrofit,lifetime,20.0,years,"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-21, accessed 2025-04-16",,2019.0,, | ||
| cement dry clinker,FOM,4.0,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,, | ||
| cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,, | ||
| cement dry clinker,carbondioxide-output,0.52,t_CO2/t_clinker,https://www.ipcc-nggip.iges.or.jp/efdb/ef_detail.php, Basic Search Description 'Emission factor for clinker production' EF ID 213926 Original value 0.52 per Mt clinker,2015.0,, |
| cement carbon capture retrofit,lifetime,20.0,years,"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-21, accessed 2025-04-16",,2019.0,, | ||
| cement dry clinker,FOM,4.0,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,, | ||
| cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,, | ||
| cement dry clinker,carbondioxide-output,0.52,t_CO2/t_clinker,https://www.ipcc-nggip.iges.or.jp/efdb/ef_detail.php, Basic Search Description 'Emission factor for clinker production' EF ID 213926 Original value 0.52 per Mt clinker,2015.0,, |
|
@fneum Following problem: |

Changes proposed in this Pull Request
During clinker production, the calcination process leads to unavoidable process emissions independent of what's used to supply the heat.
For endogenous heat modelling and cement modelling it is helpful to have this emissions factor in technology data.
The data is from the IPCC Database EF ID 213926 and shows a value of 0.52 tonne CO2/tonne clinker produced
Compared to e.g. POSTED it is slightly higher:
total emissions - coal demand x coal emissivity
0.6361765 − 0.6634401×0.3361 = 0.413194282 tCO2/tclinker
Happy to hear thoughts on that